Items where Subject is "HD28 Management. Industrial Management"
- Repositori Untag Semarang (1)
- H Social Sciences (1)
- HD Industries. Land use. Labor (19)
- HD28 Management. Industrial Management (19)
- HD Industries. Land use. Labor (19)
- H Social Sciences (1)
.
., Priyambodo (2024) ANALISIS PENGGUNAAN EXCAVATOR PADA PROYEK JALAN SURODADI - PUJUD KECAMATAN GRINGSING KABUPATEN BATANG. Undergraduate thesis, Universitas 17 Agustus 1945 Semarang.
A
Avian, Aldohan Faza (2024) PENERAPAN REKAYASA NILAI PADA PROYEK PEMBANGUNAN GUDANG MORTAR DI KOTA SALATIGA. Undergraduate thesis, Universitas 17 Agustus 1945 Semarang.
Ayulina, Pithalona (2023) PERAN KEPUASAN KERJA SEBAGAI PEMEDIASI HUBUNGAN KARAKTERISTIK PEKERJAAN DAN KETERLIBATAN KERJA DENGAN KINERJA KARYAWAN (Studi Kasus di PT. Samudera Perdana Selaras). Masters thesis, Universitas 17 Agustus 1945 Semarang.
B
Bekti, Hendi Nuswantoro (2024) ANALISA KEBUTUHAN MAN POWER PADA PROYEK GEDUNG GARDU INDUK TEGANGAN EKSTRA TINGGI PLN BATANG. Undergraduate thesis, Universitas 17 Agustus 1945 Semarang.
E
Emiliana, Sri Pudjiarti and Honorata, Ratnawati Dwi Putranti (2020) Integrasi Fleksibilitas Strategis dan Kapabilitas Pembelajaran Organisasi sebagai Second-order Factor terhadap Kinerja Inovasi dan Perusahaan. Jurnal Maksipreneur: Manajemen, Koperasi, dan Entrepreneurship, Vol.10 (No.1).
F
Fatkhurrohman, Ahmad Nur (2024) ANALISIS RESCHEDULE WAKTU PADA PROYEK PENGENDALIAN BANJIR DAN ROB DI KAWASAN TAMBAK LOROK SEMARANG TAHAP II. Undergraduate thesis, Universitas 17 Agustus 1945 Semarang.
I
Indah, Oktari Wijayanti and Listiana, Sri Mulatsih and Loso, Judijanto and Nurchayati, Nurchayati and Yahya, Yahya (2023) THE INFLUENCE OF COMPANY DEBT AND PROFITABILITY ON COMPANY VALUE WITH PRODUCT QUALITIY AS A MODERATING VARIABLE. Edunomika, Vol.8 (No.1).
K
Khakim, Faramitha Rahmatul (2024) ANALISIS FAKTOR PENYEBAB CONTRACT CHANGE ORDER PADA PROYEK PEMBANGUNAN RUKO KABUPATEN JEPARA. Undergraduate thesis, Universitas 17 Agustus 1945 Semarang.
L
Lestari, Putri (2024) ANALISIS KELAYAKAN INVESTASI PADA PROYEK PERUMAHAN GRAHA CITRA GADING GUNUNGPATI KOTA SEMARANG. Undergraduate thesis, Universitas 17 Agustus 1945 Semarang.
M
Mahardhika, Nur Rochmani (2024) FAKTOR-FAKTOR PENENTU DALAM PEMILIHAN PENYEDIA JASA PADA LELANG PASCAKUALIFIKASI (STUDI KASUS PADA PELELANGAN PAKET PEKERJAAN BELANJA MODAL PEMBANGUNAN GEDUNG RUMAH SAKIT (RSUD KOMODO)). Undergraduate thesis, Universitas 17 Agustus 1945 Semarang.
P
Putra, Evan Dani Dewangga (2024) PENGARUH PCM (PRE CONSTRUCTION MEETING) PADA KEBERHASILAN SUATU PROYEK KONSTRUKSI. Undergraduate thesis, Universitas 17 Agustus 1945 Semarang.
Putranti, Honorata Ratnawati Dwi and Sulistiyani, Sulistiyani (2023) Leading the Digital Revolution Examining the Impact of Digital Leadership on Work Performance and Organizational Commitment in the Kawasan Industri Mitra (KIM). Jurnal Manajemen Industri dan Logistik, Vol.7. ISSN 2598-5795
Putri, Aulia Herandah Kharisma (2024) ANALISIS PERBANDINGAN BIAYA DAN WAKTU PEKERJAAN PENUTUP ATAP GALVALUM DAN UPVC PADA PROYEK TERMINAL DEMAK. Undergraduate thesis, Universitas 17 Agustus 1945 Semarang.
R
Rois, Muhammad Abdul (2024) OPTIMALISASI SUMBER DAYA PROYEK MENGGUNAKAN METODE CRASING STUDI PADA PROYEK PEMBANGUNAN SARANA OLAHRAGA UNIVERSITAS NEGERI SEMARANG. Undergraduate thesis, Universitas 17 Agustus 1945 Semarang.
S
Setiawan, Didin (2024) ANALISIS FAKTOR YANG MEMPENGARUHI TENAGA KERJA BERSERTIFIKASI TERHADAP KESUKSESAN PROYEK KONSTRUKSI DI KABUPATEN GROBOGAN. Undergraduate thesis, Universitas 17 Agustus 1945 Semarang.
Sudirjo, Frans and Sulistiyani, Sulistiyani (2023) The Role of Competitive Advantage Mediates Entrepreneurial Orientation and Product Innovation on Marketing Performance. Jurnal Manajemen Industri dan Logistik, Vol 7 (No 1). ISSN 2598-5795
Sulistiyani, Sulistiyani and Hutomo, Prihatin Tiyanto Priagung (2021) Model of Product Quality Development on Marketing Performance in Semarang District. South Asian Research Journal of Business and Management, Vol 3. ISSN 2664-6757
T
TIYO, NURAKHYAR (2023) ANALISIS KERJASAMA TIM DAN KUALITAS KEHIDUPAN KERJA TERHADAP KINERJA KARYAWAN MELALUI KEPUASAN KERJA SEBAGAI VARIABEL MEDIASI (Studi Pada Karyawan Kedai Extra Pedas Loempia Bom Purwokerto). Masters thesis, Universitas 17 Agustus 1945 Semarang.
Y
Yahya, Muhammad Iqbal (2024) ANALISIS PERBANDINGAN WAKTU DAN BIAYA PEKERJAAN SALURAN IRIGASI METODE CASTIN-SITU DAN PRECAST PADA PROYEK REHABILITASI DAERAH IRIGASI (D.I.) GLAPAN BARAT. Undergraduate thesis, Universitas 17 Agustus 1945 Semarang.