PENENTUAN KRITERIA PRIORITAS DALAM PERENCANAAN PROYEK JEMBATAN MENGGUNAKAN AHP (ANALYTICAL HIERARCHY PROCESS) (Studi Pada : Jembatan Sungai Waluh Desa Kabunan, Pemalang)

Sampurno, M. Bagus (2025) PENENTUAN KRITERIA PRIORITAS DALAM PERENCANAAN PROYEK JEMBATAN MENGGUNAKAN AHP (ANALYTICAL HIERARCHY PROCESS) (Studi Pada : Jembatan Sungai Waluh Desa Kabunan, Pemalang). Undergraduate thesis, Universitas 17 Agustus 1945 Semarang.

[thumbnail of TA_M.BAGUS SAMPURNO_211003222011403 - 1406_C_Erike Maya Sofia Anita.pdf] Text
TA_M.BAGUS SAMPURNO_211003222011403 - 1406_C_Erike Maya Sofia Anita.pdf

Download (3MB)
[thumbnail of M. Bagus Sampurno - lembar konsultasi.jpeg]
Preview
Image
M. Bagus Sampurno - lembar konsultasi.jpeg

Download (77kB) | Preview

Abstract

ABSTRAK

Perencanaan proyek infrastruktur jembatan, khususnya di wilayah perdesaan dengan sumber daya terbatas, dihadapkan pada proses pengambilan keputusan yang kompleks untuk menyeimbangkan berbagai kriteria yang saling bertentangan. Studi kasus pada Proyek Pembangunan Jembatan Sungai Waluh di Desa Kabunan, Pemalang, menyoroti tantangan ini, di mana proyek didanai dari dana desa yang terbatas dan berlokasi di area dengan akses logistik yang sulit. Penelitian ini bertujuan untuk mengidentifikasi dan menentukan urutan prioritas kriteria. perencanaan jembatan menggunakan pendekatan kuantitatif yang sistematis. Metode yang digunakan adalah Analytical Hierarchy Process (AHP) dengan data primer yang dikumpulkan melalui kuesioner dari enam responden ahli yang terdiri dari unsur pemerintah desa, konsultan, kontraktor, dan dinas pekerjaan umum. Hasil analisis perhitungan manual kemudian divalidasi menggunakan software Expert Choice untuk menjamin akurasi. Hasil penelitian yang telah divalidasi menunjukkan bahwa kualitas & kinerja teknis merupakan kriteria dengan prioritas tertinggi (bobot 0,516), diikuti oleh waktu pelaksanaan (0,154), biaya konstruksi (0,115), pemanfaatan sumber daya lokal (0,091), kemudahan metode pelaksanaan (0,084), dan ketergantungan pada alat berat (0,039). Hasil ini terbukti konsisten dengan nilai CR sebesar 0,10. Dominasi mutlak pada kualitas menegaskan bahwa untuk infrastruktur vital, jaminan keamanan, kekuatan, dan umur layanan struktur menjadi pertimbangan utama yang tidak dapat dikompromikan, bahkan dalam kondisi sumber daya yang terbatas.

Kata kunci: Analytical Hierarchy Process (AHP), Prioritas Kriteria, Manajemen Proyek, Jembatan Desa, Pengambilan Keputusan Multi-Kriteria.

===============================================================

ABSTRACT
The planning of bridge infrastructure projects, particularly in rural areas with limited resources, involves a complex decision-making process to balance various conflicting criteria. A case study on the Sungai Waluh Bridge Construction Project in Kabunan Village, Pemalang, highlights this challenge, where the project is funded by limited village funds and is located in an area with difficult logistical access. This research aims to identify and determine the priority order of bridge planning criteria using a systematic quantitative approach. The method used is the Analytical Hierarchy Process (AHP), with primary data collected through questionnaires from six expert respondents, including representatives from the village government, consultants, contractors, and the public works agency. The manual calculation results were then validated using Expert Choice software to ensure accuracy. The validated research results indicate that quality & technical performance is the criterion with the highest priority (weight of 0.516), followed by construction time (0.154), construction cost (0.115), utilization of local resources (0.091), ease of construction method (0.084), and dependency on heavy equipment (0.039). These results were proven to be consistent with a CR value of 0.10. The absolute dominance of quality confirms that for vital infrastructure, ensuring the safety, strength, and service life of the structure is a primary consideration that cannot be compromised, even under conditions of limited resources.

Keywords: Analytical Hierarchy Process (AHP), Criteria Prioritization, Project Management, Rural Bridge, Multi-Criteria Decision-Making.

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Analytical Hierarchy Process (AHP), Prioritas Kriteria, Manajemen Proyek, Jembatan Desa, Pengambilan Keputusan Multi-Kriteria.
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TD Environmental technology. Sanitary engineering
T Technology > TG Bridge engineering
Divisions: Fakultas Teknik > 22201 - S1 Teknik Sipil
Depositing User: Fakultas Teknik
Date Deposited: 01 Sep 2025 05:19
Last Modified: 07 Jan 2026 05:53
URI: http://repository.untagsmg.ac.id/id/eprint/2282

Actions (login required)

View Item
View Item