PERENCANAAN ULANG PONDASI BORED PILE PADA PEMBANGUNAN GEDUNG 150KV CONTROL BUILDING PT. INDAH KIAT PULP AND PAPER KARAWANG

Pradista, Renanda Dwi (2025) PERENCANAAN ULANG PONDASI BORED PILE PADA PEMBANGUNAN GEDUNG 150KV CONTROL BUILDING PT. INDAH KIAT PULP AND PAPER KARAWANG. Undergraduate thesis, Universitas 17 Agustus 1945 (Untag) Semarang.

[thumbnail of Tugas Akhir_Renanda Dwi Pradista_211003222011401 - Renanda.pdf] Text
Tugas Akhir_Renanda Dwi Pradista_211003222011401 - Renanda.pdf

Download (374kB)
[thumbnail of renanda d. pradista - lembar konsultasi.pdf] Text
renanda d. pradista - lembar konsultasi.pdf

Download (308kB)

Abstract

ABSTRAK

Pondasi merupakan elemen vital dalam konstruksi bangunan karena berfungsi
menyalurkan beban dari struktur atas ke lapisan tanah pendukung secara aman
tanpa menimbulkan penurunan berlebihan. Pada proyek pembangunan Gedung
150KV Control Building PT. Indah Kiat Pulp and Paper Karawang, desain awal
menggunakan pondasi tiang pancang (spun pile) berdiameter 60 cm dengan
kedalaman 30 m. Penelitian ini bertujuan untuk merencanakan ulang (redesain)
pondasi menggunakan bored pile dengan dimensi yang sama, serta membandingkan
efisiensi teknis dan biaya konstruksi dengan pondasi tiang pancang. Metode yang
digunakan meliputi analisis pembebanan struktur atas menggunakan perangkat
lunak SAP2000 v.14 untuk menentukan beban maksimum pada pondasi, serta
perhitungan daya dukung bored pile menggunakan metode Reese & Wright (1977)
berdasarkan data hasil Standard Penetration Test (SPT). Perhitungan efisiensi
kelompok tiang dilakukan dengan metode Converse-Labarre. Hasil analisis
menunjukkan daya dukung ujung (Qp) sebesar 845,154 kN, daya dukung selimut
(Qs) sebesar 5652 kN, dan daya dukung izin (Qall) sebesar 2157 kN. Untuk pile
cap 1 (PC1) dibutuhkan 2 tiang bored pile dengan beban maksimum Pmax 1478,587
kN yang masih lebih kecil dari Qall, sehingga aman secara teknis. Dari segi biaya,
pondasi bored pile dengan 69 titik memerlukan anggaran sebesar Rp 2.616.290,140,
sedangkan pondasi tiang pancang dengan 133 titik membutuhkan Rp
6.380.830.159, sehingga terdapat potensi penghematan sebesar Rp 3.764.540,020
miliar. Hasil penelitian ini menunjukkan bahwa bored pile tidak hanya memenuhi
persyaratan teknis daya dukung, tetapi juga memberikan keuntungan ekonomis
yang signifikan, sehingga direkomendasikan sebagai alternatif pondasi
untuk proyek sejenis.
Kata kunci: Fondasi Bored Pile, Daya Dukung, Biaya Kontruksi

============================================================

ABSTRACT

Foundation is a vital element in building construction as it transfers loads from the
superstructure to the supporting soil layer safely without causing excessive
settlement. In the construction project of the 150KV Control Building at PT. Indah
Kiat Pulp and Paper Karawang, the initial design used spun pile foundations with
a diameter of 60 cm and a depth of 30 m. This study aims to redesign the foundation
using bored piles with the same dimensions and to compare the technical efficiency
and construction costs with those of spun pile foundations. The methodology
includes structural load analysis using SAP2000 v.14 to determine the maximum
load on the foundation, as well as bored pile bearing capacity calculation using the
Reese & Wright (1977) method based on Standard Penetration Test (SPT) data.
Group pile efficiency was calculated using the Converse-Labarre method. The
analysis results show an end bearing capacity (Qp) of 845.154 kN, skin friction
capacity (Qs) of 5652 kN, and allowable bearing capacity (Qall) of 2157 kN. For
pile cap 1 (PC1), two bored piles are required with a maximum load (Pmax) of
1478.587 kN, which is less than Qall, ensuring technical safety. In terms of cost,
bored pile foundations with 69 points require a budget of IDR Rp 2.616.290,140,
while spun pile foundations with 133 points require IDR 6,380,830,159, resulting
in potential savings of approximately IDR 3.764.540,020. This study concludes that
bored piles not only meet the technical requirements for bearing capacity but also
offer significant economic advantages, making them a recommended alternative for
similar projects.
Keywords: Bored Pile Foundation, Bearing Capacity, Construction Cost

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: Fondasi Bored Pile, Daya Dukung, Biaya Kontruksi
Subjects: T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: Fakultas Teknik > 22201 - S1 Teknik Sipil
Depositing User: Fakultas Teknik
Date Deposited: 07 Sep 2025 13:42
Last Modified: 07 Jan 2026 05:52
URI: http://repository.untagsmg.ac.id/id/eprint/2332

Actions (login required)

View Item
View Item