ANALISA KETERLAMBATAN PROYEK DENGAN MENGGUNAKAN METODE EARNED VALUE PADA PROYEK GEDUNG KECAMATAN KENDAL KABUPATEN KENDAL

., Ruswanto (2025) ANALISA KETERLAMBATAN PROYEK DENGAN MENGGUNAKAN METODE EARNED VALUE PADA PROYEK GEDUNG KECAMATAN KENDAL KABUPATEN KENDAL. Undergraduate thesis, Universitas 17 Agustus 1945 Semarang.

[thumbnail of REPOSITORI RUSWANTO - Rus Wanto.pdf] Text
REPOSITORI RUSWANTO - Rus Wanto.pdf

Download (2MB)

Abstract

Consruction projects are a series of tasks carried out within a specific time frame, involving planning, execution, and optimization of limited resources. This research aimsto evaluate the time and cost performance, as well as estimate the cost and duration required to complete the construction of the Kendal District Office Building, Kendal Regency. From these two aspects, project control can be done using the earned Value Method. This study used data such as the Budget Plan (RAB), Project Time Schedule, Actual Project Time Schedule (from week 5 to week 8),and weekly Project Progress reports to calculate the values of BCWS, BCWP, and ACWP using the earned value method.

...

Item Type: Thesis (Undergraduate)
Uncontrolled Keywords: cost control, time control, earned value method
Subjects: H Social Sciences > HD Industries. Land use. Labor > HD28 Management. Industrial Management
T Technology > TA Engineering (General). Civil engineering (General)
T Technology > TH Building construction
Divisions: Fakultas Teknik > 22201 - S1 Teknik Sipil
Depositing User: Fakultas Teknik
Date Deposited: 13 Mar 2025 06:28
Last Modified: 13 Mar 2025 06:28
URI: http://repository.untagsmg.ac.id/id/eprint/1593

Actions (login required)

View Item
View Item